Science. . approved plan. Through this exposure, students will have better understanding of engineering practice in general and sense of frequent and possible problems. During industrial training, students can assess their ability to work from employers. COMPANY CLASSIFICATION (SIZE): SME, Large Enterprise, etc, No of employees h) Honesty and responsibility in performing tasks. of Engineering (Hons) Electronic Engineering (EE241) to complete eight weeks of a 25811976 Industrial Training Report. I can use all this experience as my preparation for the real work in thefuture. Exposurethat has been given to me by KPJ Johor staff about the working and technical aspect is a verymeaningful knowledge to me to prepare myself before stepping into the real work environmenton the upcoming days. Figure 30: New cable layout using cable ducting .. Error! Specifically, Planned Maintenance isa scheduled service visit carried out by a competent and suitable agent, to ensure thatan item of equipment is operating correctly and to therefore avoid any unscheduledbreakdown and downtime. 254.2.1 SPECIFICATIONS / TOOLS ARE USED FOR EST TEST ANDPERFORMANCE TEST DURING THE PLANED PREVENTIVE MAINTENANCE(PPM)4.2.1.1 ESA 620 FLUKE Figure 4.2.1.1 ESA 620 FLUKEThe ESA620 Electrical Safety Analyzer represents quality excellence in manualpreventive maintenance for the biomedical technician and clinical engineer thatperform tests on medical equipment. Siwes Report | PDF | Electrical Wiring | Electricity - Scribd Undergraduate students of the following: Agriculture, Engineering, Technology, Environmental, Science, Education, Medical Science and Pure and Applied Sciences. Tech in Electrical Engineering in the year 2018 from Kalinga Institute of Industrial Training, Bhubaneswar, and completed Diploma in Electrical Engineering in the year 2015 from Jnan Chandra Ghosh Polytechnic College, Kolkata. Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma DIESEL LOCOMOTIVE WORKS VARANASI, Summer Training Report. Currently, a minimum period of 10 weeks at industry has been made compulsory for all engineering programmes offered at the higher learning institutes. FINAL REPORT INDUSTRIAL TRAINING SESSION DECEMBER 2020 - AnyFlip Industrial - Student Intern - Electrical Engineering Job in Charlotte Its showed that the control box are problem andneeds to troubleshoot. Figure 42: Wiring detail of measurement devices . 36 The humidifier have be check byusing the Rigel analyzer while during the EST test. 1) Turn ON the VS4 using AC charge or battery power. We've encountered a problem, please try again. Do not immerse any part of equipment in liquid. (PDF) Internship Report for Electrical Engineering by Muhammad Gulraiz Pull the loose edge to remove any slack and close the recorder door. SPOTLightsets up in seconds to send Peripheral capillary oxygen saturation (SpO2), heart rate,perfusion, transmission, artifact noise, and eight different manufactures custom R-curves to a pulse oximeter or patient monitor. better known as KPJ Johor Specialist Hospital(KPJ Johor) opened its door to the public in May 1981. at . Always acknowledge all other contributors to the work, TheESA615 is an all-in-one solution with a safety analyzer and ECG simulator in a singleelectrical safety test instrument. 2.4. Bookmark not defined. The 39CHAPTER 6 CONCLUSION6.1 CONCLUSION After undergoing 20 weeks of industrial training at KPJ Johor Specialist Hospital thereare a lot of new knowledge that can be learned and I get to understand altogether on how thisfirm plays an important role in industrial field, especially in Quantity Surveying. This chapter also explains how Maintenance works30 prevention and repair of damage with more detailed. Silence all alarms indefinitely-audio off mode, pressalarm silence key for two second.Enabling print on alarm.Open the alarm menu and touch the print on alarm check box to select thedesired setting. Industrial training in the field of engineering is an integral part of the curriculum as it is considered to be the first job experience for a 'would-be professional.' As a trainee of the company, there is a lot of learning involved where students get a hands-on approach in work life. 9) For choose another function, just select according the screen display. drafting, computer aided drawings (CAD), practical works, public relation customer 62.1.4 KPJ JOHOR EMBLEM Figure 2.1.4 Logo KPJ JohorKumpulan Perubatan JohorFrom its inception to the end of 2009, KPJ Healthcare Group (KPJ stands forKumpulan Perubatan Johor), which mainly involved in private hospital care business,was expanding very fast within Malaysia. MR. ROHIT RASTOGI The electrosurgical have error alarm the CEMalarm and the red light are turn ON, the electrosurgical had be send to vendor to berepair. allocate under electrical division. The students themselves can infuse the spirit of productivity to the challenges and obstacles that lie ahead. - Currently working as a Co-op student with Hydrogen Optimized in Electrical Engineering Team in making the manufacturing systems fully automated with the help of Programable Logic Controllers and Human Machine Interface. Press the main screen key on the frontpanel to close the menu.Adjusting the pulse rate volume.Open the pulse rate menu and touch the pulse rate tone volume meu item.Touch a number to increase or decrease the volume. The students are required to pass before the Industrial Training is recommended for award of a diploma at any school. Do not sell or share my personal information. As a traineeI was educated for do my duties with honesty and trust because this value will give thequality work of ones work and ones trust in us. Thereare 18 KWAN clinics and 1 Hospital Waqaf An-Nur (HWAN) in Malaysia today, aswell as five mobile clinics in Kuala Lumpur, Johor, Selangor, and Kelantan.Our efforts have enabled more than one million patients since the inception of the firstclinic in Johor in 1998.2.1.6 LOCATIONKPJ Johor Specialist Hospital Figure 2.1.6.1 KPJ Johor Specialist Hospital Main EntranceJohor Specialist Hospital opened its doors to the public in May 1981, as the first privatehospital in Johor. After that, I meet with En . All breakdown and PPM had handling by KPJ biomedstaff during this Movement Control Order (MCO). THANESH RAW A/L RAMASAMY GENISAN CONSTRUCTION AND ENGINEERING WORKS SDN.BHD LOT 10437 BATU 4 3/4, KAMPUNG JAWA, KLANG, SELANGOR, 41000 . More responsibility is placed on students with project reports than with lab reports. Christopher W. Romaine B.S.E.E. - Part-Time Student / Master of Exposing the IT Students to important facilities that can help them in their field of study. Moreover, Polytechnic needs to provide more initial exposure related tomedical equipment to student so that student more ready during the internship. You can download the paper by clicking the button above. During my internship, I took quite a long time to get to work at KPJ JohorSpecialist Hospital. Figure 26: Single-line diagram for feeder pillar . Error! of the public. Students should have completed required elective modules to be better to undergo at least eight weeks of industrial training as part of their course. Shall provide accurate and complete information including use of traditionalmedicine and shall accept all the responsibility of the patient's own informed decision4. The Company also offers expertise in allied contracting activities such as electrical, plumbing, fire-fighting and industrial projects, in order to offer turnkey solutions, apart from execution of . Student's industrial work experience scheme (SIWES) is a programme designed by the industrial training (IT) especially for the training of students in various institutions . I had exposed and knowingthe various of imaging medical equipment such as MRI, CT-Scan, x-ray mobile,lithotherapy equipment, physiotherapy equipment, ICU and A&E departmentequipment. Its Headquarter are in the town Degema.it has an Area of one thousand Eleven kilo miter square and a population of about two hundred fourth nine thousand Seven hundred and seventy four. 72.1.5 BRAND SIGNATUREKPJ Group made its mark in healthcare-related industries, primarily KPJ SeniorLiving Care services and Healthcare Education. I am a final year student of HND in Electrical Engineering who completed National Apparantice internship in Sri Lankan well reputed companies such as Ceylon Electricty Board and Central Engineering Services private limited. In electrical division, there are two sub-division for maintenance work which includes Now the transmission line first parallel connected with lightning arrester to diverge surge, followed by CVT connected parallel. I have completed atleast 6 months of inpalnt industrial training period under various division in Electrical Engineering field. Morerver, I had dothe payment certificate for PPM with my supervisor for medical equipment at KPJJohor. I am grateful to Zamri bin Mohammed Jaib (my father), NadzarineBinti Abdul Aziz (my mother), Sulaiman bin Mohd Noor (my stepfather) and myfamily members and my friends to constant guidance, support, and valuablesuggestions during this internship. By whitelisting SlideShare on your ad-blocker, you are supporting our community of content creators. Students will be able to apply the skills that they have gained throughout their academic years. TRAINING Hi, I'm Samuel! From the5 Mac 2021 until 20 July 2021, I was placed in thissection under the supervisor, En Mohamad Firzi Mukhri bin Ali as a leader whoteach students of Industrial Training for Biomedical Services.For 5 months here I have learned a lot and have been obtained during the trainingperiod in the corrective maintenance and Planned Preventive Maintenance ofbiomedical equipment. The industrial attachment report should follow this format. Mechanical Engineering Handbook, Air Conditioning and Refrigeration by Rex Miller.pdf, Handbook of Air Conditioning and Refrigeration(2), HANDBOOK OF AIR CONDITIONING AND REFRIGERATION, Heating, Ventilating, and Air-conditioning SYSTEMS AND EQUIPMENT Inch-Pound Edition, Gene Strehlow (2) Building and System Analytics Dermot McMorrow (18) Mitsubishi Electric Canada, Gas turbine, HRSG, Combined Cycle, Steam Power Plant, Turbine maintenance workshop, INTERNSHIP REPORT ON INDUSTRIAL TRAINING AT GHORASHAL TRAINING CENTER (GTC), Electrical Power Systems Technology Third Edition. Figure 3.7.1 Oxygen sensor of GA machine. Khairulaiman bin Nordin, Ms. Saidatul Aina Binti Mohamad Yunusand Ms. Noor Athirah binti Mohamad Fudzi. Additionally, the 25-A-device receptacle allows for testing of thosedevices that need it, so the technician is not limited to only test 15-A equipment.4.2.1.2 ESA 615 FLUKE Figure 4.2.1.2 ESA 615 FLUKEThe ESA615 Electrical Safety Analyzer brings fast and simple automated testing inthe form of a portable analyzer to healthcare technology professionals that performelectrical safety testing on medical equipment both in the field and in facilities.Whether it is simple testing or comprehensive analysis, the ESA615 can do it all. Inevery phase of the internship, his supervision and guidance shaped this report to becompleted perfectly.In addition, I also do not forget the technician staff of KPJ Johor (Biomedical Services)who always teach and manage matters and take care of me while undergoing IndustrialTraining in this organization. I had change the weightscale battery . The programme worth 16-credit hour, which is almost equivalent to a semester academic load and is, called Industrial Internship Programme. During this MCO i have work fromhome and do a lots of research from medical equipment website for gain myknowlegde.WEEK 20 ( 19 JULY 2021 20 JULY 2021)Updated my log book and report of industrial training. Industrial Training Report Preparation Guidelines - isikun.edu.tr SIWESwas established byITFin 1973 to solve the problem of lack of adequate practical skills preparatory for employment in industries by Nigerian graduates of tertiary institutions. PDF Report on Student Industrial Work Experience Scheme (Siwes) Training 2.1 Nature of Activities Carried Out During the Training Programme. 4.2 RECOMMENDATION I will advise that more Electrical engineering students be posted to the organization for their SWEP and SIWES. All the institutions of higher learning in Malaysia that offer Engineering programmes have this requirement in their curriculum. 1.2 MPSPK Function . ZAKKI Student industrial work experience scheme (SIWES) compliment students through exposure to practical aspect of their courses, having physical contact and interaction with staff and members of the general public. CENTRAL TRANSPORT SHOP Haneef Thameem - Technical Executive - Apogee International - LinkedIn Industrial training report Chanaka Sudheera 5.8k views 94 slides CEB Presentation 2073 Chethiya Sathruwan 2.9k views 16 slides Ceylon Electricity Board Wickramarathne GT 6k views 98 slides Report of undergraduate training at ceylon electricity board Kulendran Anujan 1.1k views 54 slides More Related Content Slideshows for you (20) I am passionate about engineering, research, entrepreneurship and using my skills to solve challenges faced on the African continent. infrastructures, and public facilities division, while electrical engineering student will be (okorie 2002, in Asikadi 2003). . Students must complete 12 weeks of industrial training to be eligible to graduate. In this Chapter, Iwill explain more way of working while undergoing Industrial Training at KPJ JohorSpecialist Hospital for 20 weeks. Other than that, I suggest tostudent for choose their internship place as close as they can with house for avoid thecosting during internship. Under the guidance of Yang DiPertua Majlis Perbandaran Sungai Petani, MPSPK leadership is leaded by a chairman whose will be in charge for 2 years before replaced I also have update the calibration date and seriel number of equipment had do calibration in BEMS folder. . Disconnect the probe and remove it from the well. Furthermore, I can apply the knowledge I learned theoretically or practicallyin KPJ Johor Specialist Hospital. e) Adopt and comply with safety regulations in the industry. There are two situations which is corrective maintenance andemergency breakdown. Thet Paing Lwin, PMP,ITIL4 - Electrical Engineering Student - Uniteam UNSW Engineering students who have Industrial Training as a program requirement, must complete 60 days of approved Industrial Training (IT) to graduate and qualify for accreditation by Engineers Australia (EA). Figure 38: Sample of conductors and cable terminators . Error! Water tube Boilers are: Available in sizes that are far greater than the fire tube design. Ledby skilled and caring medical staff, we are consistently focused on clinical excellenceand innovative technology for superior patient outcomes.Core Values Safety Courtesy Integrity Professionalism Continuous improvement 52.1.3 THE PATIENTSS RIGHT AND RESPONSIBILITYPatient's Rights1. Industrial Training - Department of Electrical Engineering The existence of a hostel can make it easier for student going forinternship. Remove the well from the monitor. Electrical Engineering SIWES Report. 2 . During the period of my internship work,I have received generous help from many quarters, which I like to put on record herewith deep gratitude and great pleasure. REPORT: Format of the report is according the sample format. Do not clean electrical contacts or connectors with bleach. Figure 23: Feeder pillar details front view . Error! Bookmark not defined. What Should You Expect To Learn From Your Industrial Training? Sri Dato' Seri Haji Osman bin Haji Aroff, PSM, SSDK, DHMS, JMN, JP the Menteri There is no plan inplace to complete it. Each assigned task must follow processes and procedures that have been setit carried out in stages. In this position, I was placed in the Department ofBiomedical Services (BEMS). It also can add and expand technical knowledge and skills of the student, if the student has previously acquired knowledge is limited, but when students attend this training, students can find out more about things, and when something will work. Industrial training work report Authors: Akinloye Bukunmi University of Ibadan Abstract and Figures This Report presents the experience and skills gained during my 3 months of industrial. A keypad willappear. Lastly, student involvement in industrial training like this can prove and furtherstrengthen student's identity in undergoing training in technical field, at the same time makingPolytechnic as practical platform of education. It is 90 % smaller and lighter than single- function patient simulators, provides one-tap testing for most patient monitor checks, and runs all day on a single battery charge. -2)Conduct weekly workshop on the tools and instruments used in Electrical system. Training report on 33/11 kV power substation Do not sell or share my personal information, 1. Without his kind direction and proper guidance,this study would have been a little successful. SHOW ALL Mechanical Engineering Chemistry Environmental Science and Sustainability Physics and Astronomy Research Methods Earn Your Degree Big Clock c) To expose students to the real working environment. Aided, AICTE NBA Accredited. Identify public health and safety issues in electrical engineering working environment. Other than that, the exposurevisiting the other KPJ Johor, meeting atmosphere and so on also give a useful knowledge tome. To ensure the utilization of buildings are according to the stated conditions. 1961. . Use a soft cloth to clean the display window to prevent scratching. 95-108, Mar. g) Raise awareness and increase student interest in the subject selected. We've updated our privacy policy. Figure 3.17.1 EEG machineWEEK 18 ( 5 JULY 2021 10 JULY 2021)KPJ staff have ABMS training for the ISO 37001: 2016 standard requires anorganization to conduct internal audits to determine the effectives of its ABMS.Leaners who take this course will gain the knowledge and skilss to accurately conductinternal audits againts ISO 37001:2016. You need to include certain ingredients to make them succeed. Basaveshwar Engineering College, Bagalkot. ENELY ALEX - Student at PNG University of Technology - Lae, Papua New Open the screw cover of monitor display using the screw driver and change the new LCD display. council, Maintain the 'lysaugh' public lightings placed in the regulation of the Council, Supervise and monitor the provision of electrical projects from KPKT, Investigate and resolve public complaints relating to public lightings, Check the electrical related applications from TNB. Electrical Engineering Industrial training-in-chandigarh Mohali This is the report on industrial trining in DLW Varanasi. Ms atirah had teach me how to open the LCD display using the proskit kit tools. DLW Electrical Engineering industrial training Report. 2.3 Relationship of the Training to Course of Study; The related experience to the course of study is that of the practical work executed during the training which is based on employee interaction and general/staff satisfaction to achieve aims and objectives of the Company. For example, student must beprepared to bring their own test pen and another simple tools for repair medicalequipment. Figure 39: Sample of cables, cable termination and assesories Error! MPSPK facility unit, and street lighting unit. 35The parameter of NBP module.Parameter SpecificationSystolicDiastolic 30mmHg - 270mmHg (4.0kPa-36.0kPa)MAP 10mmHg 245mmHg (1.3kPa-32.7kPa)Pulse Rate range 20mmHg-255mmHg (2.7kPa-34.0kPa)Blood pressure 30bpm 300 bpmaccuracyPulse rate accuracy Accuracy: 2% from 70% -100%Initial Cuff Inflation Maximum standard deviation L 8mmHgTemperature Maximum mean error: bpmspecifications 40bpm - 100 bpm: 5bpm 101bpm - 200bpm: 5% of reading 201bpm 300bpm: 10% of reading Adult: 160mmHg (21.3kPa) Pediatric: 140mmHg (18.7kPa) Neonatal: 100mmHg (13.3kPa) Monitored mode measurement: 26.7 - 43.3 Predictive mode measurement: 34.4 - 40.6 Accuracy: 0.1 364.7.6 Breakdown Vital Sign 4. Recognized VTU Research Centre), Basaveshwar Engineering College, Bagalkot-587102, TEQIP Lead Institute AICTE Recognized, Affiliated to, Department of Electrical and Electronics Engineering, Mr. Sangamesh. null. Open the fuse casing using the test pen, and replace the new fuse into right place. We had changed it with the new battery. Currently: Open to employment opportunities and continuing to pursue a Masters Degree in Electrical Engineering at Florida Atlantic University. STUDENT ID : 2020995295 c) To expose students to the real working environment. Assigment Chapter 1 - EPO246 LM.UiTM (O). Clipping is a handy way to collect important slides you want to go back to later. The cot side rail are broken and need to change with the new cot side rail. Students ivTABLE CONTENTTITLE PAGESTitle iDeclaration iiPengesahan Tamat Latihan Industri Pelajar iiiAcknowledgments ivTable Content vList Of Tables viList Of Figures viiCHAPTER 1: INTRODUCTION 11.1 Introduction Industry Training 21.2 Objective of Industry Training 31.3 Importance of Industry TrainingCHAPTER 2: BACKGROUND OF INDUSTRIAL TRAINING PLACE 42.1 Introduction 4 5 2.1.1 Profile Company 6 2.1.2 Vision, Mission, Core Values 7 2.1.3 Patients Right & Responsibility 8 2.1.4 KPJ Johor Emblem 8-9 2.1.5 Brand Signature 10 2.1.6 Location 112.2 Organization Chart 112.3 Organization Information 12 2.3.1 Biomedical Organization Structure 122.4 Department Function 13 2.4.1 Head of Services 14 2.4.2 Unit Manager 2.4.3 Medical OfficerCHAPTER 3: SUMMARY OF IDUSTRIAL TRAINING ACTIVITIES 153.1 Introduction 16-243.2 Summary of Industrial Training ActivitiesCHAPTER 4: TECHNICAL SYSTEM 254.1 Introduction 254.2 Planned Preventive Maintenance (PPM) 26-28 26 4.2.1 Specifications Tools for PPM and EST Test 26 4.2.1.1 ESA 620 FLUKE 27 4.2.1.2 ESA 615 FLUKE 27 4.2.1.3 Rigel 2888+ Electrical Safety Analyzer 28 4.2.1.4 ProSim 4 Vital Sign and ECG Simulator 28 4.2.1.5 ProSim 8 Vital Sign and ECG Simulator 29 4.2.1.6 ProSim SPOTLiGHT SPO2 Pulse Oximeter Analyzer 29 294.3 Unplanned Maintenance4.4 Emergency Breakdown 4.4.1 Breakdown Tools Kit vTITLE PAGES4.5 Beyond Economic Repair (BER) 294.6 Testing and Commissioning (T&C) 304.7 Operation of Vital Sign 4 Monitor 30 30 4.7.1 Introduction 31-32 4.7.2 Label of Function 33 4.7.3 Procedure of Vital Sign 4 34 4.7.4 Common Problem of Vital Sign 4 35-36 4.7.5 Planned Preventive Maintenance (PPM) Vital Sign 37 4.7.6 Breakdown Vital Sign 4 38CHAPTER 5: RECOMMENDATIONS AND IMPROVEMENTS 395.1 Findings5.2 Recommendations 40CHAPTER 6: CONCLUSION 416.1 Conclusion 42REFERENCES 43 44APPENDIX 1: PPM RESULT OF GASTROSCOPY 45APPENDIX 2: T&C DOCUMENTS 46APPENDIX 3: MAINTENANCE REQUEST FORM 47APPENDIX 4: WORK PASS APPLICATION FORM 48APPENDIX 5: REQUISITION FORM FOR SERVICE/REPAIRAPPENDIX 6: WORKPLACE MANAGEMENT SYSTEMAPPENDIX 7: ACTIVITIESviLIST OF TABLESTABLE PAGESOrganization chart 10Biomedical organization structure 11Head of Services 12Unit Manager 13Medical Officer 14Label of function of SureSign VS4 Monitor 31-32 viiLIST OF FIGURESFIGURE PAGES2.1.1 KPJ Johor Specialist Hospital Building 52.1.4 Logo KPJ Johor 82.1.6.1 KPJ Johor Specialist Hospital Main Entrance 92.1.6.2 KPJ Johor Maps 103.1 KPJ Johor Outpatients Building 163.1.1 Cot side rail patients bed LKL 173.2.1 T&C warmer unit machine, ATOM 183.3.1 PPM of humidifier Ventilator AVEA using Rigel analyzer 183.4.1 ECG waveform not stable and ECG simulator to calibration 193.5.1 PPM of Laser Therapy machine 193.5.2 PPM of Shockwave therapy machine 203.7.1 Oxygen sensor of GA machine 203.9.1 PPM of Tympanometer 213.10.1 Change the side connecter of warner unit 213.12.1 Fuse changing of VSU monitor 223.14.1 EPOC machine 233.15.1 Voltage Stabilizer problem 233.16.1 Site visit of Linac replacement 244.2.1.1 ESA 620 FLUKE 264.2.1.2 ESA 615 FLUKE 264.2.1.3 Rigel 288+ Electrical Safety Analyzer 274.2.1.4 ProSim 4 Vital Sign and ECG Simulator 274.2.1.5 ProSim 8 Vital Sign and ECG Simulator 284.2.1.6 ProSim SPOTLight Spo2 Pulse Oximeter 284.4.1 Breakdown tools 294.7.1 SureSign VS 4 monitor 304.7.3 Basic Operations of SureSign VS4 monitor 33 viiiCHAPTER 1 INTRODUCTION1.1 INTRODUCTION OF INDUSTRY TRAININGThe industrial training compulsory for every student Diploma in ElectronicEngineering (Medical) as a condition for the award of the diploma. Turn on the monitor and try to calibrate the date and time.BP cuff error pressure.The BP cuff cable have a leakge, so need to change with the new cable cuff.The pressure of cuff are low cause of the cable leakage. Faculty e.g. This exercise can highlight the ability of students to work hard and to work with dedication and show a positive attitude to the employer.